NFPA 110 is the US standard for emergency and standby power systems, and it is the reason most American generators get load-bank tested every year. If a standby diesel never runs near full load, unburned fuel and carbon build up in the exhaust — 'wet stacking' — which fouls the engine and can cause it to fail exactly when it is needed.

The US standby-power standard

Why the annual
load bank test
matters.

NFPA 110 is the US standard for emergency and standby power systems, and it is the reason most American generators get load-bank tested every year. If a standby diesel never runs near full load, unburned fuel and carbon build up in the exhaust — 'wet stacking' — which fouls the engine and can cause it to fail exactly when it is needed.

The annual test loads the generator to prove it can carry its rated output, and to burn off that build-up. NFPA 110 expects diesel sets that don't reach roughly 30% of nameplate in normal running to be exercised under added load; the load bank supplies that load, cleanly and controllably, when the building's own load can't.

  • Annual load-bank test of the standby generator
  • Exercise sets that don't reach ~30% of nameplate in service
  • Burns off wet stacking; proves full-rated output
  • Documented, repeatable results for the AHJ

How to load bank test a generator

The test, step by step.

01

1 — Connect

Connect the load bank at the generator output or a downstream breaker, sized to the set's rated kW.

02

2 — Ramp to Load

Bring the generator up and step the load to rated output, watching voltage and frequency stability.

03

3 — Hold at Full Load

Run at full rated load long enough to reach stable temperatures and burn off wet stacking.

04

4 — Log & Document

Record kW, voltage, frequency and temperatures for the maintenance record and the AHJ.

Quotation within 24 hours

Request a quote.

Tell us your rating and application — our engineers reply fast with a specification and price. Fastest route is WhatsApp.

Generator Testing Load Bank · Quote request

Your request goes straight to our sales team. Prefer to talk? Call or WhatsApp +44 7723 212134.

FAQ

Common questions.

What does NFPA 110 require for load bank testing?
NFPA 110 requires emergency and standby generators to be tested under load. Diesel sets that do not reach about 30% of their nameplate rating in normal operation must be exercised with additional load — supplied by a load bank — to prove rated output and prevent wet stacking, typically annually.
How do you load bank test a generator?
Connect a load bank rated to the generator's kW, start the generator, step the load up to rated output, hold at full load until temperatures stabilise and wet stacking is burned off, then log kW, voltage, frequency and temperatures for the record.
What is wet stacking and how does a load bank prevent it?
Wet stacking is the build-up of unburned fuel and carbon in a diesel generator that is chronically under-loaded. Running the set at full load with a load bank raises exhaust temperatures and burns off that build-up, keeping the engine healthy.