Region · Asia-Pacific · Tier 2
Load Banks in
Thailand.
Ashford supplies the full load-bank range across Thailand — engineered to TIS and built in 50 Hz. A fast-growing data-centre market (AWS, Google, Microsoft) plus the Map Ta Phut petrochemical/LNG complex.
Frequency
50 Hz
Conformity
TIS +
Base Std
IEC 61439
Delivery
Worldwide export
The market
Why Thailand
needs load banks.
A fast-growing data-centre market (AWS, Google, Microsoft) plus the Map Ta Phut petrochemical/LNG complex. Every new facility must prove its generators, UPS and switchgear under load before go-live — and Ashford supplies that capability, certified for Thailand and shipped worldwide. See our certifications for the full compliance route.
DAData Centre Load Banks in ThailandPower-train and white-space commissioning — BMS integration, A/B feed, continuous duty.→ACAC Resistive Load Banks in ThailandReal-power (kW) testing of generators, UPS and prime power. 10 kW to 3 MW, LV to 11 kV, 50/60 Hz.→REResistive + Reactive Load Banks in ThailandCombined kW + kVAR loading at lagging power factor for true alternator and full-system testing.→
Shipping a load bank
to Thailand?
Tell us the rating, voltage and destination in Thailand and our team will specify the right unit — certified for your market and quoted within one working day.