DC Load Banks · South Africa
DC Load Banks
in South Africa.
Battery, UPS, telecom, traction and BESS testing. 24–1000 VDC, constant current / power. Supplied to South Africa — engineered to SABS / NRCS in 50 Hz.
Frequency
50 Hz
Conformity
SABS +
Base Std
IEC 61439
Delivery
To site
DC Load Banks
DC Load Banks
for South Africa.
Battery, UPS, telecom, traction and BESS testing. 24–1000 VDC, constant current / power. South Africa is The data-centre hub for sub-Saharan Africa, where chronic Eskom grid instability makes standby-power testing mission-critical. — so proving power under load, on a certified unit built for South Africa (SABS / NRCS, 50 Hz), matters. Ashford manufactures and ships worldwide.
Also available in South Africa
DC Load Banks for
South Africa.
Tell us the rating and the site in South Africa — we will confirm the specification, compliance for South Africa and a quotation within one working day.