DC Load Banks · Saudi Arabia
DC Load Banks
in Saudi Arabia.
Battery, UPS, telecom, traction and BESS testing. 24–1000 VDC, constant current / power. Supplied to Saudi Arabia — engineered to SASO / SABER in 50 Hz.
Frequency
50 Hz
Conformity
SASO +
Base Std
IEC 61439
Delivery
To site
DC Load Banks
DC Load Banks
for Saudi Arabia.
Battery, UPS, telecom, traction and BESS testing. 24–1000 VDC, constant current / power. Saudi Arabia is Vision-2030 AI build-out (HUMAIN 200 MW campuses) plus the vast Aramco oil, gas and petrochemical base in the Eastern Province. — so proving power under load, on a certified unit built for Saudi Arabia (SASO / SABER, 50 Hz), matters. Ashford manufactures and ships worldwide.
Also available in Saudi Arabia
DC Load Banks for
Saudi Arabia.
Tell us the rating and the site in Saudi Arabia — we will confirm the specification, compliance for Saudi Arabia and a quotation within one working day.