AC Resistive · Poland
AC Resistive Load Banks
in Poland.
Real-power (kW) testing of generators, UPS and prime power. 10 kW to 3 MW, LV to 11 kV, 50/60 Hz. Supplied to Poland — engineered to CE marking in 50 Hz.
Frequency
50 Hz
Conformity
CE marking +
Base Std
IEC 61439
Delivery
To site
AC Resistive
AC Resistive Load Banks
for Poland.
Real-power (kW) testing of generators, UPS and prime power. 10 kW to 3 MW, LV to 11 kV, 50/60 Hz. Poland is Warsaw is a leading emerging CEE data-centre market; Gdansk is a Baltic LNG/energy gateway. — so proving power under load, on a certified unit built for Poland (CE marking, 50 Hz), matters. Ashford manufactures and ships worldwide.
Also available in Poland
AC Resistive for
Poland.
Tell us the rating and the site in Poland — we will confirm the specification, compliance for Poland and a quotation within one working day.