Load Bank Manufacturer 40 Years of Engineering Experience
Global Delivery & Commissioning +44 (0)0000 000000
Products All Company 01 Certifications 02 Locations 03 Partners 04 Contact 05

AC Resistive · Nigeria

AC Resistive Load Banks
in Nigeria.

Real-power (kW) testing of generators, UPS and prime power. 10 kW to 3 MW, LV to 11 kV, 50/60 Hz. Supplied to Nigeria — engineered to SONCAP / SON in 50 Hz.

Frequency
50 Hz
Conformity
SONCAP +
Base Std
IEC 61439
Delivery
To site

AC Resistive

AC Resistive Load Banks
for Nigeria.

Real-power (kW) testing of generators, UPS and prime power. 10 kW to 3 MW, LV to 11 kV, 50/60 Hz. Nigeria is West Africa's data-centre gateway where an unreliable grid makes standby-generator testing essential, plus NLNG gas-to-power. — so proving power under load, on a certified unit built for Nigeria (SONCAP / SON, 50 Hz), matters. Ashford manufactures and ships worldwide.

View the full AC Resistive range & ratings

AC Resistive for
Nigeria.

Tell us the rating and the site in Nigeria — we will confirm the specification, compliance for Nigeria and a quotation within one working day.