Load Bank Manufacturer 40 Years of Engineering Experience
Global Delivery & Commissioning +44 (0)0000 000000
Products All Company 01 Certifications 02 Locations 03 Partners 04 Contact 05

DC Load Banks · Manchester

DC Load Banks
in Manchester.

Battery, UPS, telecom, traction and BESS testing. 24–1000 VDC, constant current / power. Supplied to Manchester — engineered to UKCA + CE in 50 Hz.

Frequency
50 Hz
Conformity
UKCA + CE +
Base Std
IEC 61439
Delivery
To site

DC Load Banks

DC Load Banks
for Manchester.

Battery, UPS, telecom, traction and BESS testing. 24–1000 VDC, constant current / power. Manchester is the fastest-growing UK secondary data-centre hub — so proving power under load, on a certified unit built for United Kingdom (UKCA + CE, 50 Hz), matters. Ashford manufactures and ships worldwide.

View the full DC Load Banks range & ratings

DC Load Banks for
Manchester.

Tell us the rating and the site in Manchester — we will confirm the specification, compliance for United Kingdom and a quotation within one working day.