Data Centre · Madrid
Data Centre Load Banks
in Madrid.
Power-train and white-space commissioning — BMS integration, A/B feed, continuous duty. Supplied to Madrid — engineered to CE marking in 50 Hz.
Frequency
50 Hz
Conformity
CE marking +
Base Std
IEC 61439
Delivery
To site
Data Centre
Data Centre Load Banks
for Madrid.
Power-train and white-space commissioning — BMS integration, A/B feed, continuous duty. Madrid is Europe's fastest-growing data-centre market (~1 GW by 2030) — so proving power under load, on a certified unit built for Spain (CE marking, 50 Hz), matters. Ashford manufactures and ships worldwide.
Also available in Madrid
Data Centre for
Madrid.
Tell us the rating and the site in Madrid — we will confirm the specification, compliance for Spain and a quotation within one working day.