Resistive + Reactive · Alexandria
Resistive + Reactive Load Banks
in Alexandria.
Combined kW + kVAR loading at lagging power factor for true alternator and full-system testing. Supplied to Alexandria — engineered to EOS in 50 Hz.
Frequency
50 Hz
Conformity
EOS +
Base Std
IEC 61439
Delivery
To site
Resistive + Reactive
Resistive + Reactive Load Banks
for Alexandria.
Combined kW + kVAR loading at lagging power factor for true alternator and full-system testing. Alexandria is a refining, petrochemical and Mediterranean port hub — so proving power under load, on a certified unit built for Egypt (EOS, 50 Hz), matters. Ashford manufactures and ships worldwide.
Also available in Alexandria
Resistive + Reactive for
Alexandria.
Tell us the rating and the site in Alexandria — we will confirm the specification, compliance for Egypt and a quotation within one working day.